Photovoltaic energy systems completely isolated from the electrical grid.
Experience
15 years of experience installing photovoltaic systems.
#1 in Energy Storage
Leader in energy storage in the southeast of the country.
Pioneers
We made the 1st 100% GridIndependentBlue Planet Installation in the southeast.
Warranties
Product warranties of up to 15 years of useful life per battery.
Photovoltaic Power and Independence
We are the leading energy storage company in the southeast of Mexico.
Practically any equipment that works with electrical energy, the ideal is always to make a dimensioning to meet your specific needs.
Each of our PV Installations is different, however our average start-up time is approximately 15 days (regardless of the signing of agreements with CFE).
The process is the following:
1. First contact and sizing.
2. Lifting.
3. Delivery of economic proposal and plans.
4. Signing of contracts.
5. Installation (3 to 5 days on average).
6. Start of procedures with CFE to obtain a bidirectional meter.
7. Meter change.
8. Start up.
9. Delivery of guarantees.
Certified mounting systems can withstand wind speeds of up to 177km/h which is equivalent to a category 2 hurricane, however it is always advised to disconnect the photovoltaic system and remove all solar panels as windblown debris can reach to hit a solar panel with the risk of being damaged.
Climatic and environmental conditions, such as high temperatures; the correct orientation and inclination of the panels, the correct electrical installation and the technology used to manufacture a solar panel are the main factors that determine a low or high performance of these devices.
That's why we recommend that you carry out your photovoltaic installation with high-quality products and with a Solar Energy Partner with the experience, certifications and necessary infrastructure.